Laserfiche WebLink
CIRCES Cost EstlmatinD Software <br />EOUIPMEN7 MOBILIZATION I DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agenry or organization name : DMG <br />iask#: 076 State:Cdorado PermiVOb#:M-1997.048 <br />Date: 03r192003 Cpunry:Eag/e Abbreviation:crone <br />User GRM Site:Card Ann Pit Filename: M026-076 <br />Permit ar atherjob action :Final Redama8on Costs Update <br />Teak desuiption :secondary seeding mobllha0on <br />EQUIPMENT TRANSPORT RIG COST Shifl basis : 1 par tlay <br />Cost dale source : CRG Dafa <br />TukVador tlesaiption :Generic on-highway frvck tracYw, 6x4, tliesel poaered, 400 HP <br />Available ng capedties : 0.25 Tons 28-50 Tons <br />CoslBreaktlown: Ownership msMpur: E24.34 E28.98 <br />Operetin0 costaaua: E28.49 830.27 <br />Operator cosVhour: E27.07 E2707 <br />Helper msVhour: $0.00 E23.78 <br />Total Unit DOSMWr: E78.80 Ef08H <br />NON-ROAOABLE EQUIPMENT <br />Matlrine WeighWnil Ownership Haul Rip Fleet S¢a Haul Tdp <br />Description (Tons) Castor/unit Cosuhr/unit (NO. units) CosMr/neet 51 * Tans <br />E3309 <br />E3d 3d <br />E2707 <br />E23.78 <br />E1f8.28 <br /> <br />Ratum Trip DOT partnit <br />CosVhrmeet CosVlleet <br /> <br /> <br /> <br />-rewg hacror 10.00 81000 E79.90 1 E89.90 E78.90 $000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: EB9.90 E79.90 f0.00 <br />ROADABLE EQUIPMENTt ~ -~ ~_ - -- . ~ <br />Machine Total Fleet Siza <br />Desciption CostdrourNnit (N0. unfts) ~ - - ~ - ~ ~ _ <br />Haul Trip Retum Trip <br />CosMr/geet CosMrAleat <br />-FIa10e0 Tnxk, 4x2, 30K GVW A52 /2 f E52.f2 b52.12 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SuDtotala: E54.12 EE4.12 <br />EQUIPMENT XAUL WSTAN CE and TIME <br /> Nearest major ary or town within proje4 area region : Eag/a <br />Trensoonetion Cvcle Tine: Nan- Total one-way Vavel tlistaltce: 6.0 miles <br /> Roedabla RoadaDle Average Vavel speed : 35.0 mph <br /> Equipment Equipment <br />Haul lima (hour)= 0.17 0.f7 Total non-roedaDle moNdenrob mM-: E23802 <br />Relum time (hours) = 0.17 0.17 • two mono tops wan lum rp <br />Loading time (hours)= 0.50 NA Total roatlable moDldemoD COSt^: Ef7. a7 <br />Unloading lima (hours)= 050 NA --om mono tnp.mnamN <br />Subtotals= 1.34 0.34 <br />JOB TIME AND COST Total job time : 4.69 hours <br /> Total joD COSt: E458 <br /> <br />