Laserfiche WebLink
CIRCES Cost EstlmatinD Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br /> <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br />Task#: 07a State:CObrado PenniVOb a:M-1997-OY6 <br />Data: 0Y19/2003 Couiriy:Eegle Aobreviatian:none <br />User- GRM Site:Caro/Ann Rf Filename: M026-01a <br />Permit or otherjob action :Final Reclamation Costa Uppare <br />Task description : iniflal mobllizailon fo and from stte <br />,r. ~ - _ _. <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br />Cost date source : CRG Dale <br />Thick traitor tlwcriptian :Generic on-highway truck fraclw, 6x4, tliesel powered, 400 HP <br />r.. r~...,.ie. we ~ a,u;..., ..,v~.n.w,e mm~rlxYen~.inmanffmiMr/257 SOT arM 10071 <br />Available rig caparJties: 0.25 Tons 2650 Tons 51~ Tons <br />CostBreaktlown: Ownership casghour: E2d 34 526.99 53308 <br />Operetirq cosMOUr: 526.49 530.27 534.34 <br />Operetor cosghour: 5170] 527.07 52707 <br />Helper costRrour: 5000 523.76 513.78 <br />Total Unit Costrtrour: 579.90 510811 Effa28 <br />NON-ROADABLE EQUIPMENT <br />Machine WeighUunit Ownership Haul Rig <br />Description (Tons) CosMr/unit CosMr/untl <br />Fleet Sae <br />(NO. units) <br />Haul Tdp Return Trip DOT Parma <br />CosMrttlaet CasOhrHleet CosU6eet <br />-Cef D8R Series II - eSU 52.55 550.51 Ef 18 28 1 Ei66J9 5718 28 50.00 <br />-CAi14H 20.70 539.90 579.90 i Nf9.80 579.90 50.00 <br />-Cef 633E Sedes2 56.34 572.62 5118.28 1 5190.90 Ei18.28 50.00 <br />-reveg tractor 1000 Ef0.00 57990 1 569.90 57990 50.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SaMOMIE: f569.99 fJ9a.J8 f0.00 <br />I ~~ _ ._ <br />c onwousuT <br />MarJtine <br />Descrption Total <br />CwMOUr/unit Fleet Sae <br />(NO. unite) Heul TnD <br />CosMr/6aet Relum Trip <br />CosMr/Ileet <br />-Flafoed TNCk, 4x2, 30K GVW 552./2 / 152.12 552.12 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SubtoMis: f51.11 f61.11 <br />EQUIPMENT HAUL DISTAN CE end TIME <br /> Nearest major dly or Ivan wiNin projeq area region : Eagle <br />Trensoortat on CVde Time: Non- Total one-way travel distance: 6.0 miles <br /> Rcedable Roetlabla Average travel epeetl: 350 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.17 0.17 Total non+oadabla mab/demob wet •: Ef, 489.89 <br />Return lime (hours)= 0.17 0.1] •sxo mono ibpa MN haul ds <br />Loading time (Iwurs) = 0.50 NA Total roatleble mowdemob cost ^: 51787 <br />Unloatling time (hours) = 0.50 NA me mwa inP. no neul rb <br />SuMMals= 1.34 03d _ <br /> ~ <br />JOB TIME AND COST Tatel job lima: 269 Noun <br /> TWaI job msl : <br />- - 51./98 <br />. 1. - ... _ ~ .. - <br />