My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-10_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2003-06-10_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:32 PM
Creation date
11/21/2007 6:17:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
6/10/2003
Doc Name
Permit Amendment Approval
From
DMG
To
Climax Molybdenum Company
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 09f <br />Date : 06/05/2003 <br />User : ACS <br />State :Colorado <br />Couniy :Grand <br />Site :Henderson Mill <br />Agency or organization name :Colorado Division O/Minerals And <br />Permit or other job action :Amendment AM-004 <br />Task description :Finish grade topsoil borrow area <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Attachment no. 1 :NA <br />Attachment no. 2 : Multi-shank ripper <br />Horsepower: 215 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cosUhour : $39.90 NA <br />Grader operatingcost/hour : $39.94 100 <br />Ripper operating cost/hour : $1.22 30 <br />Operator cosUhour : $24.92 NA <br />Total unit cosUhour : $105.97 Totat fleet cosUhour : $105.97 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 227.00 acres <br />Width of blade overlap per pass : 2.00 feet <br />Net gfading or ripping width per pass : 10.10 feet" •• width of ripper beam on ripping applications <br />Unadjusted hourly unit production : 1.5303 acres/hour <br /> <br />Job Condition Correction Factors Source <br />Average site altitude : 8,900 feet Altitude adjustment factor : 0.98 (Cat HB) <br /> Job e~ciency adjustment factor : 0.85 (1sh/d, mod.) <br /> Netjob correction : 0.8330 multiplier <br /> <br />Adjusted houdy unit production : 1.2747 acres/hour <br />Adjusted houdy fleet production : 1.2747 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 178.08 hours <br />Unit cost : $83.13 per acre Total job cost : $18,871 <br />Filename :M342-09f <br />PermiUjob # : M-1977-342 <br />Abbreviation :none <br />
The URL can be used to link to this page
Your browser does not support the video tag.