My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-10_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2003-06-10_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:32 PM
Creation date
11/21/2007 6:17:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
6/10/2003
Doc Name
Permit Amendment Approval
From
DMG
To
Climax Molybdenum Company
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity <br />Basis <br />Material weight : 2,100 pounds/LCY <br />Material description <br />Earth -Loam <br />Bowl (volume) Basis <br />Struck volume <br />Heaped volume <br />Average volume <br />sheet 2 of 2 <br />21.00 LCY <br />31-00 LCY <br />26.00 LCY <br />Rated payload : 75,000 pounds Adjusted capacity : 26.00 LCY *'* <br />Payload CapaClly : 35.71 LCY "' hourly production reflects volume per scraper pair on push-pull models <br />Cvcle Time : Job Condition Corrections : Site altitude (ft.) : 8,900 <br /> Scraper Push dozer Source <br />Scraper loading time * : 1.00 minutes Altitude adj.: 0.980 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />'load time per scraper pair on push-pull models Net Correction : 0.813 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 4,000 0.00 5.00 5.00 1867 2.26 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time <br />Return route <br />fable velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 569.28 LCY/hour **" Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />2.26 <br />5.48 <br />463.06 <br />2 <br />463.06 <br />926.11 <br />minutes <br />minutes <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br />"travel time for each segment is atljusted for acceleretion/deceleration. RetUfn time : 1.62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.