My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-10_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2003-06-10_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:32 PM
Creation date
11/21/2007 6:17:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
6/10/2003
Doc Name
Permit Amendment Approval
From
DMG
To
Climax Molybdenum Company
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost EstimatinaSoflware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION ~~ Agenq or organization name :DMG <br />Task # : 01a <br />Date: O6-Jun-2003 <br />User: ACS <br />Pemulting action :Amendment AM-04 <br />State :CObrado Permtlob#:M-1977-34I <br />County:Gear Creek AbbreWation :none <br />Site :Henderson Mine Fllename:M342-Ofe <br />Task description : Mlne Structural Demolltfon <br />.~ ::: :~ ~:' ....i:: :i: ::.... ~t: <br />UNIT COSTS ~~ Last unit cost uptlate: January, 2001 Loption adjustment: 88.00% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION pUANTITV UNIT UNIT COST TOTAL COST <br />DIRge/Dry M remain (AM-4) <br />D/THwDry Concrete Fbor <br />OIFicMOry Concrete Foundafbn <br /> <br />Surface ShophYarehouse to remain (AM-0) <br />SurMce ShOpANarehouse Conaefe Fkxx <br />SuAace S/rophNarehause Concrete FOOfmps <br /> <br />-Compressor BUd0ag 160800 lMmoltlisplexishlg pd-200'push 160,800.00 CF 501409 $22.653.]3 <br />-Compressor Buddng Concrete Fkxu 8465 sq R. BlasVdisp. on sde 8,96500 SF 51.4100 5//,935.65 <br />Conpefe Footngs-leave in dace <br /> <br />-Plant Surface BUddirg 59600 w.R. DemoJdisupJexisfing pR-fOK'haul 59,60000 CF 50.1462 58,714.98 <br />-Plant Surface BUddug Concrete Floor 3875 sq.R. BlasVdkp. on sde 3,9]5.00 SF $1.4100 55,604.75 <br />Concrete Fpotirgs- leave in place <br /> <br />-#1 Shag 290,000 w.R. DemOJtlisplexis8rlg pit-f0'K haul 500,500.00 CF $02298 $115,014.90 <br />-#15haR Concrete Fhxv 5382 sqR &asf/disp. on site 5,382.00 SF §1.df00 $7,588.62 <br />Concrete Footlrgs- leave b place <br /> <br />-#1 Shag HOisfhouse 290.000 w.R. Demol0ispJexistirg pd-fOK'haul 290.00000 CF §0.1482 542,40509 <br />-111 ShaRhouse COnoete Fbor 9fi69 sqR. BMSNOAp. an sde 9,669.00 SF §1.4100 513, 633.29 <br />Concrete Footngs- Move b place <br /> <br />-#25heR 849900 w.R. DemoldispJexistkg PR-50'PUSh 849,90000 CF 50.2162 5183,782.38 <br />-#2 Shag Concrete Fbor 49705gR BlasVdisp. on sRe 4,9]0.00 GF §1.4100 57,00].70 <br />Concrete Footings- leave te adce <br /> <br />-#2 Shag HORfh0use 367000 w.R Demol0isplexisfmg pd-200'push 361,000.00 CF E0 1409 $50,858.18 <br />-62 Shag floisfhouce COnaete Fbor 19414 sq.R BIasVOisp. on sde 14,4fA.00 SF 51.4100 $20323.74 <br />Concrete Foofugs- leave n place <br /> <br />-#3 Shag HeaterBWtlkig 217400 w.R. Demoltlisplexistirg pR-200'WSh 217400.00 CF $01409 530,62761 <br />-#3 Shag Heater Budding Concrete Fbor 7248 sq.R BlasUdisp. on sde 7,248.00 SF Ef 4100 $10,219.68 <br />Canaefe Footings- leave M place <br /> <br />-Aggregate Sfackdg BUddirg 2]800 w.R DemoJdisplexisting pR-200'push 27.80000 CF 50.1109 53,816.50 <br />-Agg. Stackug BUYding Concrete Fbor 1855 sq.R. BlasOdisp. on sde 1,855.00 SF 51.4100 52,61555 <br />Concre(e Footugs-Nave M place <br /> <br />-Bld atlj.ro SlaW'ng BUddulg 2600 w.R. DemoJdisplexish'ng pd-200'push 2,800.00 CF 50.11 f9 529098 <br />-Concrete Fbor 200 sq.R. &asVdisp. on sde 200.00 SF E1.df00 $28200 <br />Concrete Footug- leave in pbce <br /> <br />-Batch Plant 21900 Denroldisplexisfug pd-50'push 21,900.00 CF 501349 52,953.46 <br />-Batch Plant Concrete Fbw 1458 sq R. &asVdkP. on site 1,45800 SF 51.4100 52.055.78 <br />Concrete Faotirg- leave M place <br /> <br />-Bulk Od Storage BUddirg 18000 w.R. Demoldisp/exisfbp pd-fOK'haul f8, 00000 CF 50.1113 52,110.65 <br />-Bulk Od Storage Concrete Fbor 1200 sqR. Blasgdkp. on sde 1,200 00 SF 51.4100 51,692.00 <br />Gonr4ete Faotkg- learo b place <br /> <br />-137d atlj.roUSadW Tank 1260 DemoJOisplexistvg pd-fOK'haul 1,260.00 CF 501173 5/4715 <br />-Bld adj.roOd Tank ConaeM Fkxa 1265q.R. BIasNOap. on sde 126.00 SF §t4f00 5171.66 <br />Conr4ete Faofkg- leave M place <br /> <br />-Fan COnfrpVSwdch Gear Bb 38100 w.R. OemoJdisplexisfvg pit-fOK'haul 38,100.00 CF §01482 $5,5]1.15 <br />-Fan CantrWSlniUr Gear Connate Fbor 2928 sq.R. BIasVOisp. on We 2,928.00 SF §1.4100 54,128.48 <br />Concrete Foofdg- Mare in gate <br /> <br /> <br /> <br />JOB COST Topl (adj. torlawtlon): 5/95,118 Total COSt (urudjustedj: f358,]1] <br />
The URL can be used to link to this page
Your browser does not support the video tag.