Laserfiche WebLink
Task Olu: DMG originally estimated that the entire 120 acres of affected land at the mine site would <br />require maintenance fertilization three-times subsequent to seeding and initial fertilization. With the <br />reduction of acreage to be revegetated at the mine to 100 acres, the number of acres to be fertilized was <br />reduced. The reduction in acreage results in a lowering of the estimated direct maintenance <br />fertilization cost of $2,402. <br />