My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-03-04_REVISION - M1986015 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2002-03-04_REVISION - M1986015 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:52:06 PM
Creation date
11/21/2007 6:15:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
Revision
Doc Date
3/4/2002
Doc Name
Amendment Application
From
Transit Mix of Pueblo Inc
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN <br />Exhibit D <br />Mining Plan <br />Linkages to Mining Plan Maps in Exhibit C <br />This exhibit presents the mining plan for this site. Some of the maps contained in <br />Exhibit C should be referred to when reviewing this exhibit. Following is a list of the <br />relevant maps in Exhibit C. <br />1. Exhibit C-1: General Site Map -This map shows the relationship between the <br />existing permit area and the amended permit area. The primary area covered by this <br />mining plan is in approximately the western half of the total permit area and includes <br />the existing permit area. <br />2. Exhibit C-2: Surface Owners -This map does not have a high degree of <br />relevance to the mining plan, but does show the parcels of land adjacent to this site and <br />the owners of those parcels. This map also shows the locations of permitted wells adjacent <br />to the site. <br />3. Exhibit C-3: Mining Plan Map -This map shows the relationship between the <br />two phases and the most basic information regarding Phase 1, which is the phase that is <br />specifically addressed in this mining plan. <br />4. Exhibit C-4: Phase 1 Detail Map -This map zooms into the Phase 1 area in <br />Exhibit C-3 and shows the details involved in the mining plan for Phase 1. It also <br />contains some very basic narrative that describes the fundamentals o£ the mining plan. <br />Figures 1 and 2 contained in this exhibit (Exhibit D) link back to this map and provide <br />details regarding the sediment control and water discharge methods. <br />5. Exhibits C-5 (Soils), C-6 (Vegetation), and C-7 (Wetlands) -These maps <br />have very little relevance to the actual mining plan, but are important for describing the <br />environmental setting of the site. These maps are most relevant to Exhibits I and J. <br />Pueblo East Pit Amendment Exhibit D Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.