Laserfiche WebLink
Results for the sampling and analysis of the annual groundwater quality samples will be provided to DMG in an <br />annual report to be submitted within 90 days of the completion of field work for each annual sampling event. <br />Results of the semi-annual CKD leach testing will also be included in the annual report.. The following elements <br />will be included in these reports: <br />• Groundwater elevations for all existing monitoring wells and piezometers, <br />• Results of field groundwater pazameter measurements for all monitoring wells, <br />• Results of laboratory analyses of groundwater collected from all monitoring wells, including <br />laboratory reports, and <br />• Results of laboratory CKD leachate analysis, including laboratory reports. <br />4.7 Compliance Plan <br />Upon establishment of numeric protection levels and point(s) of compliance by DMG, a compliance plan will be <br />developed and submitted by Holcim. The compliance plan will adhere to the requirements set forth in DMG's <br />Groundwater Compliance Protocol. <br />Iznzroz engineers & scientists 4-4 <br />GmuMwata Monimring Plen Itdot <br />