My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-12-16_REVISION - M1977344
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2002-12-16_REVISION - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 1:01:05 PM
Creation date
11/21/2007 6:14:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
12/16/2002
Doc Name
Second Adequacy Review-Response
From
Holcim (US) Inc.
To
DMG
Type & Sequence
TR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Results of the three leaching procedures will be evaluated to determine the most reasonable leaching test to <br />use for future monitoring of CICD. Results of this evaluation and the rationale for the chosen leaching procedure <br />will be forwarded to DMG once they are available. <br />4.5 Laboratory Analysis <br />One duplicate sample will be collected during each sampling event to monitor data quality. At the end of each <br />day of sampling, groundwater samples will be shipped to a qualified analytical laboratory for chemical analysis. <br />The analytical pazameters, analytical methods, and detection limits for groundwater samples are listed in Table <br />8. A chain of custody form will be included with each shipment to record sample handling. <br />Laboratory analytical reports will be prepared in a Level 2 format, which will include the following information: <br />• Cover letter with Project Chemist sign-off; <br />• Analytical Results and Practical Quantitation Limits; <br />• Methods Page; <br />• Laboratory Batch QA/QC Results: Method Prep Blanks, Lab Fortified Blanks, AnalyticaUlnstrument <br />Blanks, Lab Control Samples and Surrogates; <br />• Statement of Data Qualifiers; and <br />• Field Chain-of-Custody Form. <br />4.6 Reporting Procedures <br />A report detailing well installation, sampling and analysis methods, and results of laboratory analyses will be <br />provided to DMG within 90 days of the completion of field work currently scheduled to be completed by March <br />31, 2003. The following elements will be included in the report: <br />• Borehole logs and well construction diagrams for new monitoring wells, <br />• Locations of new monitoring wells, <br />• Groundwater elevations for all existing monitoring wells and piewmeters, <br />• Results of field groundwater parameter measurements for all monitoring wells, and <br />• Results of laboratory analyses of groundwater collected from all monitoring wells including <br />laboratory reports. <br />Results of each of the three additional quarters of groundwater samples to be collected from monitoring well <br />MW-10 prior to December 31, 2003 will be forwarded to DMG as soon as practicable after appropriate review <br />by Holcim. The following elements will be included in these reports: <br />Groundwater elevations for all existing monitoring wells and piezometers, <br />Results of field groundwater parameter measurements for monitoring well MW-10, and <br />Results of laboratory analyses of groundwater collected from monitoring well MW-10, including <br />laboratory reports. <br />BLASLAND, BOUCK & LEE, INC. <br />izriaroz engineers & scientists 43 <br />Graundwettt Mon'ttorin8 Plan ^.dot <br />
The URL can be used to link to this page
Your browser does not support the video tag.