Laserfiche WebLink
Alone L. Sco [t <br />~- January 7, 1994 <br />Page 3 • • <br />EXPENDITURES TO DATE -- TOTALS <br />Expenditures this month for professional time and expenses (from the allocation above) are <br />summarized in the table below. <br />TASK PROF. TIME EXPENSES SUBTOTAL <br />1 0 0 0 <br />2 3969.25 1131.64 5100.89 <br />3 2553.00 2.00 2555.00 <br />4 0 0 0 <br />5 0 0 0 <br />6 0 0 0 <br />TOTALS 56522.25 51133.64 57655.89 <br />Expenditures to date (including this invoice) are summarized in the table below. <br />TASK PROF. TIME EXPENSES SUBTOTAL <br />1 4048.50 543.65 4592.15 <br />2 10657.00 3513.94 14190.94 <br />3 3507.75 2.00 3509.75 <br />4 0 0 0 <br />5 0 0 0 <br />6 1029.00 50.75 1079.75 <br />TOTALS 519242.25 54110.34 $23352.59 <br />WORK PROGRESS <br />Work progress by task (as of December 31) is summarized below. <br />Task Description Status <br />1 Familiarization with Approved Plan Completed Nov 1 <br />2 Field Construction Oversight Completed Dec 9 <br />3 Oversight of Field Testing Program Report completed Jan 8 <br />4 Review of Related Technics{ Submittals Not started; conducted as directed by <br />DMG <br />5 Review of Final Construction Certifications Not started; conducted as directed by <br />DMG <br />6 Participation in Meetings Additional meetings as d rotted by <br />DMG <br />