My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-05-15_REVISION - M1984099 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984099
>
2000-05-15_REVISION - M1984099 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 1:53:46 PM
Creation date
11/21/2007 6:11:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984099
IBM Index Class Name
Revision
Doc Date
5/15/2000
Doc Name
PN M-84-099 BAILEY PIT TR HALL IRWIN CONSTRUCTIN CO IN COOPERATION WITH GOOSE HAVEN SAND & GRAVEL IN
From
BRADFORD JANES
To
DMG
Type & Sequence
TR3
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for stabilization, resoiling •revegetation for fill areas remaining above water line <br /> will comply with the established limitations of the existing permit. This includes <br /> any islands or other related features remaining above the anticipated final water <br /> levels of the planned lakes. <br /> 3. The operator states that one or both gas lines will be relocated as a result of the <br /> change in mine plan. In accordance with Rule 6.4.19, for all structures that will be <br /> directly affected by mining, the operator will need to provide the Division with a <br /> notarized agreement between the operator and the owner of the gas lines that the <br /> operator has permission to mine through the structure and/or will provide <br /> compensation for any damage to the structure. Please provide the Division with <br /> the appropriate agreements/waivers with the owners of the two referenced gas <br /> lines. <br /> 3. As indicated previously, the operator will work in cooperation with the owner to the <br /> lines and observe stated setbacks at all times. The previously stated setbacks <br /> included with your correspondence will be followed, except that any modification <br /> established between the operator and the owner of the structure by agreement will <br /> be made part of this submittal at the time such agreement is established and made <br /> known in writing to the Division, where such agreement would provide for closer <br /> setback tolerances. The lines will not be moved except by agreement with the <br /> owner and under the supervision and performance of persons qualified to perform <br /> such work. <br /> 4. The applicant states that Accessory Building will be retained for the use as a <br /> boathouse as part of the postmining land use. The operator will need to submit the <br /> following in order to leave any mining related structure in place as part of the <br /> postmining land use; <br /> • A letter from Weld County that states the Accessory Building may be left in <br /> place and meets the Weld County zoning requirements for the approved postmining <br /> land use, and <br /> • A notarized letter from the landowner requesting that the Accessory <br /> Building remain in place to achieve the end land use. <br /> 4. Weld County Department of Planning Services has been contacted respective of <br /> this concern, and while authorization is anticipated, it may be delayed due to <br /> internal processes. Included with this submittal is a letter from the Landowner <br /> acknowledging the suitability of the existing structure so designated for use a <br /> boathouse under the existing end-use. Therefore, we respectfully request <br /> conditional approval of this consideration, pending receipt by the Division of the <br /> letter of authorization from Weld County. <br /> The suitability of the structure for the intended end-use will remain in tact should <br /> the end-use later be upgraded to mixed Residential and Recreation by the later <br /> approval by Weld County of a PUD. Upon receipt of such approval, the Division <br /> will be notified as to the appropriate action or actions needed to secure release of <br /> the property by the Division, which may include the need to revise the permitted <br /> reclamation plan to include the PUD for residential use. <br /> 2 <br /> Correspondence of Monday 8 May 2000 to DMG RE: DMG Permit M84-099 - Bailey Pit: Technical <br /> Revision: Hall-Irwin Construction Co. in cooperation with Goose Haven Sand & Gravel, Inc.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.