My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-10-24_REVISION - M1987028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987028
>
2005-10-24_REVISION - M1987028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:08:04 PM
Creation date
11/21/2007 6:11:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987028
IBM Index Class Name
Revision
Doc Date
10/24/2005
Doc Name
Conv. Appl.
From
Colorado Marble L.L.C.
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil Recovery-Lower Staging Area and North End Hangingwall <br />An estimated 15000 tons of topsoil may be salvaged and stockpiled at the lower staging <br />area (5000 tons) and along the eastern edge of the affected boundary as mining operations <br />progress to the north over time. Efficiencies will be higher due to shorter haul distances <br />and lower grades. <br />Bulldozer (250 HP), projected efficiency 3501/hr, O&O $ 140/hr <br />15000 tons/350 t/hr = 43 hrs @ $140 = $6020 <br />Loader (5 yd) projected efficiency 300 t/hr, O&O $100/hr <br />15000 tons/300t/hr = 50 hrs @ $100/hr $5000 <br />Trucks (15 yd end dump) projected efficiency 200 tons/ hr O&O $85/hr <br />15000 tons/200 t/hr = 75 hrs @ $85 = $6375 <br />Interim re-vegetation costs, 6 acres stockpiles @ $850/acre projected cost of <br />Seeding and mulching 6 @ $850 $5100 <br />Topsoil Application & Grading, Lower Waste Rock Dump and Hangingwall <br />Topsoil application on lower waste rock dump will be performed by Front End Loader <br />placement at the top of the dump followed by Bulldozer pushing to final location on the <br />dump outslope. <br />Front End Loader (5 yd), projected efficiency 350 t/hr, O&O $100/hr <br />SOOOtons/350t/hr= 15 hrs @ $100/hr= $1500 <br />Bulldozer(250 I-IP), projected efficiency 350 t/hr, O&O $140 <br />5000 tons/350 t/hr = 15 hrs @ $140/hr = $2100 <br />Topsoil disking, chiseling, or contour furrowing, Tractor O&O $ 80/1u <br />5000 tons will cover app. 8.4 acres @ 1 ac/hr eff. $672 <br />Topsoil stored in stockpiles located along the eastern toe of waste rockpiles <br />Constructed along the eastern edge of the affected land boundaries will need <br />To be hauled to the top of the rockpiles for grading onto the final slopes of the <br />Waste rockpiles. <br />Front End Loader (5 yd), projected efficiency 350 t/hr, O&O $100/hr <br />10000 tons/ 350 tons/hr = 29 hrs @ $100 $2900 <br />Trucks, (15 yd end dump), projected efficiency 150 tons/hr O&O $85 <br />10000 tons/ 150 tons/hr = 67 hrs @ $85 = $5695 <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.