Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 02101/2005 <br />User : ESC <br />State :Colorado PermiUjob # :M-1981-235 <br />County :Lake Abbreviation :none <br />Site :West Tennessee Pit Filename :M235-004 <br />Agency or organization name :DMG <br />Permit or other job action :Surety Increase <br />Task description :Grade Disturbed Area <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Attachment no. 1 : NA <br />Attachment no. 2 :Multi-shank <br />Cost Breakdown Ownership cosUhour <br />Grader operating cosUhour <br />Ripper operating cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />Utilization <br />Horsepower: 215 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />$38.94 NA <br />$42.39 100 <br />$1.03 25 <br />$31.95 NA <br />$114.31 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 40.00 acres <br />$114.31 <br />Source of estimated acreage :OMG Estimate <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees' <br />Effective blade length : 12.10 feet <br />Width of blade ovedap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet " <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors <br />Average site altitude : 10,380 feet <br />at 0 degrees, blade is peryendicular <br />to direction of travel. <br />"width or dpper beam on ripping applications <br />Source <br />Altitude adjustment factor ; 0.91 I (Cat HB) <br />Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br />Netjob correction : 0.7735 multiplier <br />Adjusted hourly unit production : 1.1837 acres/hour <br />Adjusted hourly fleet production : 1.1837 acres hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 33.79 hours <br />Unit cost : $96.57 per acre Total job cost : $3,883 <br />