My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-02-02_REVISION - M1981235
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981235
>
2005-02-02_REVISION - M1981235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 6:11:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981235
IBM Index Class Name
Revision
Doc Date
2/2/2005
Doc Name
FW Increase
From
DMG
To
Webster Sand & Gravel
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatin4 Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 02/01/2005 <br />User : ESC <br />Agency or organization name :DMG <br />Permit or other job action :Surety Increase <br />Task description :Reclaim Wash Pond <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 11,130 LCY <br />Horsepower: 310 <br />$293.34 <br />LCY <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor :NA <br />-: ,. <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 <br />Average push distance : 200 feet Material consistency : 0.80 <br />Unadjusted hourly production : 491.9 LCYthr Dozing method : 1.00 <br /> Visibility : 1.00 <br />Material consistency descdption : Job efficiency : 0.83 <br />Wet, highly cohesive Spoil pile : 0.80 <br /> Push gradient : 1.00 <br />Average push gradient : 0.00 % (pos) Altitude : 0.94 <br />Average site altitude : 10,380 feet Material weight : 0.68 <br /> Blade type : 1.00 <br />Material weight : 3,400 Ibs/LCY Net correction : 0.25 <br />Weight description <br />Gravel -Wet (114 =2"diam.) Adjusted unit production : 124.57 <br /> Adjusted Fleet production : 249.14 <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Totat job time : 44.6T <br />Unit cost : $1.177 /LCY Total job cost : $13,104 <br />State :Colorado <br />County :Lake <br />Site :West Tennessee Pit <br />PermiUjob# :M-1981-235 <br />Abbreviation :none <br />Filename : M235-003 <br />Basic machine :Cat D8R Sedes 11 - SSU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />Ownership costlhour : $48.82 NA <br />Operating cost/hour : $66.09 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator costlhour : $31.76 NA <br />Total unit cosUhour : $146.67 Total fleet cosUhour <br />Swell Loose <br />factor : NA volume : 11,130 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />(Cat HB) <br />(Cat HB) <br />LCY/hr <br />LCY/hr <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.