My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1981302 (94)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981302
>
_REVISION - M1981302 (94)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 3:50:56 PM
Creation date
11/21/2007 6:04:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Revision
Doc Name
VISUAL INSPECTION
Type & Sequence
TR6
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • 25 <br /> COVERAGE 4.7 RECORD KEEPING <br /> The inspection is conducted by walking along and A dated report should be filled out for each periodic <br /> over the dam as many times as is required to see every inspection.This report should be filed along with any <br /> square foot. From any given spot a person can usually pictures that were taken.The pictures should be dated <br /> gain a detailed view for a distance of 10 to 30 feet in to keep them identified with the correct inspection <br /> each direction, depending on the smoothness of the date. Inspection observations can be recorded on the <br /> surface or the type of material on that surface, i.e.• report format at the end of this chapter. <br /> grass, concrete, riprap, brush. Two items are especially important to note during the <br /> An inspector can view from 10 ft. to 30 ft.,depending inspection to allow the observations to be evaluated <br /> on cover. properly. <br /> THE INSPECTOR MUST BE CAREFUL TO <br /> �k it ��� ���\ RECORD: <br /> 1. GAGE ROD READING <br /> 1 2. WEATHER CONDITIONS THAT INFLU- <br /> FIGURE4.5.1 SIGHT DISTANCE ENCE OBSERVATIONS ESPECIALLY RE- <br /> To cover expansive surfaces properly, several walk- CENT RAINS, EXTENDED DRY SPELLS, <br /> ings are required. SNOW COVER, ETC. <br /> In addition to the inspection observations any moni- <br /> toring measurements should be recorded in a useful <br /> format and made a part of the inspection record. <br /> } 4.8 EVALUATION OF INSPECTION <br /> OBSERVATIONS <br /> The record of periodic inspection observations is used <br /> to develop a mental picture of the dam's performance. <br /> FIGURE 4.52 SUCCESSIVE PASSES The accurate measurements pay off here because <br /> Adequate coverage can be achieved using a parallel or small changes, which would go undetected if simply <br /> zigzag path. looked at,will show a pattern or trend and the owner <br /> can begin addressing any potential problem before it <br /> becomes a threat to the dam. <br /> Immediately following the inspection the observa- <br /> tions should be compared with previous records to see <br /> if there is any condition, reading, or trend that may <br /> indicate a developing problem. When a significant <br /> i change is seen,design drawings for the dam should be <br /> examined carefully to see if an obvious reason for the <br /> DOWNSTREAM SLOPE DOWNSTREAM SLOPE change can be found. If a questionable change or <br /> trend is noted, the inspector should not hide it. He <br /> FIGURE 4.53 COVERAGE PATH should contact oneoftheprofessional engineers in the <br /> On the downstream slope a zigzag path is recom- Inspection Unit of the State Engineer's Dam Safety <br /> mended to assure that any cracking is detected. Branch or his own consulting engineer. The engineer <br /> STOP AND LOOK—At several points on the slope, will determine if any action, such as increased moni- <br /> the inspector should stop and look around for 360'to toring or detailed investigation of the condition, is <br /> check alignments and to be sure he has not over- required. <br /> looked some important feature of the slope. This cooperative action will help assure the safety; <br /> jSEQUENCE safe operation; and long, useful life of the dam. <br /> s A productive sequence of inspection that has been 4.9 SUGGESTED PLANNING <br /> used with favorable results is: Getting the most out of an inspection requires some <br /> UPSTREAM SLOPE preparatory work: <br /> CREST I. The previous inspection report should be reviewed <br /> to note any areas which will require special <br /> DOWNSTREAM SLOPE attention. <br /> ANY SEEPAGE AREAS 2. If the purpose of the inspection is to re-evaluate <br /> OUTLET questionable conditions discovered during the <br /> SPILLWAY last inspection, available design or construction <br /> drawings should be examined to see if they might <br /> Following a specific sequence will lessen thechanceof explain the situation. <br /> an important condition being overlooked. Reporting . <br /> Inspection results in the same sequence is recom- <br /> mended to allow consistent records. i <br /> it <br />
The URL can be used to link to this page
Your browser does not support the video tag.