My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-09-14_REVISION - M1986010
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986010
>
2001-09-14_REVISION - M1986010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 11:28:00 AM
Creation date
11/21/2007 6:02:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986010
IBM Index Class Name
Revision
Doc Date
9/14/2001
Doc Name
CONSTRUCTION MATERIALS REGULAR 112 OPERATION RECLAMATION PERMIT APPLICATIONFORM
Type & Sequence
CN1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E-- RECLAMATION PLAN <br /> Reclamation at the Cottonwood Pit will commence 5 years after the expansion of <br /> mining and continue throughout the life of mine. Reclamation will consist of re-grading <br /> the disturbed surface area to slopes no greater that 3:1, H:V, along with timely planting of <br /> native grasses and shrub seed mixtures. Topsoil extracted from the site will be replaced <br /> at a 6 inch depth prior to the planting of the seed mixtures. The seed mixture will include <br /> native grasses and shrubs found on the site or known to grow well in the area The seed <br /> mixture for this site is listed on the following page. This seed mixture will make it <br /> possible for the previous land use; open grazing, to resume at the termination of mining. <br /> Prior to seeding, a soil sample will be analyzed for NKP requirements. <br /> Appropriate amounts of fertilizer will be applied in accordance with soil sample <br /> recommendations. Final grading operations will include bulldozer ripping at least one <br /> foot below the surface of the flat areas to reduce compaction from front-end loader and <br /> truck operations. Seeding will commence within 30 days from final grading and ripping <br /> operations and will be scheduled in late fall or earl spring to maximize seed <br /> germination. <br /> er=broadc PLS/acr , the seeded areas will be <br /> mulched with certified x ous free Ara at 3000t#/acre and crimped into the planting <br /> medium with dozer tracks or disk apparatus. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.