My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-05-04_REVISION - M1988112 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-05-04_REVISION - M1988112 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 5:09:51 PM
Creation date
11/21/2007 6:02:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
5/4/1992
Doc Name
BATTLE MOUNTAIN RESOURCES-SAN LUIS PROJECT PN M-88-112 TR-006 FEE ENCLOSED
From
PACEL MAURO HULTIN & SPAANSTRA PC
To
MLRD
Type & Sequence
TR6
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />PABCEL, NLAUI3O, HULTIN & SPPt~JTEA, P. G. <br />ATTORNEYS AT LAW <br />DEAN R. MASSEY <br />VIA HAND DELIVERY <br />Dr. lames A. Pendleton <br />' 6UJfE 3600 <br />1601 CALIFEIRNIA STREET <br />DENVER~COLORADO 8O2O2-2fi36 <br />TELEPHONE f3OJ1292-6<00 <br />TELECOPIER IJOJ129fi-300 <br />May 4, 1992 ~~/'~ EIS ~*,~ <br />MAY 0 4 1991 <br />Mined Land <br />Reclamation 0"'I"^n <br />Technical and Scientific Coordinator <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources ("BMR") -San Luis Project <br />Permit No. M-88-112 <br />Technical Revision No. 006 (Fee enclosed) <br />Sampling and Analytical Protocol <br />Dear Dr. Pendleton: <br />DIRECT DIAL <br />(3031293-6509 <br />Enclosed with this letter you will find three copies of the above refer@nced technical <br />revision for your review. This technical revision is submitted in compliance with Abatement <br />Requirement No. 12 which was imposed in conjunction with the recent enforcement action <br />taken by your office at the San Luis facility. BMR believes that the enclosed protocol meets <br />all of the requirements set forth in Abatement Requirement No. 12 end intends to <br />commence the procedures set forth in the document upon receipt of appr4va] from your <br />office. <br />Abatement Requirement No. 12 requires BMR to propose an arrangelment by which <br />sample collection and analytical activities at the site are verified by a third party entity at <br />BMR's expense. BMR's standard practice is to conduct the required moniltoring through <br />a combination of in house technicians and outside contractors. BMR anticipates continuing <br />its practice of utilizing Halepaska and Associates for outside sampling assistance as <br />necessary and Acculabs Inc. for outside analytical work. In response to the requirement for <br />third party verification, BMR would propose that Water Waste and Land, Inc. ("WWL") be <br />retained at BMR's expense to conduct periodic sampling and analytical Work using the <br />
The URL can be used to link to this page
Your browser does not support the video tag.