My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-12-27_REVISION - M1998105
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998105
>
2004-12-27_REVISION - M1998105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 6:02:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998105
IBM Index Class Name
Revision
Doc Date
12/27/2004
Doc Name
Cost Estimate
From
DMG
To
File
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # <br />Date <br />User <br />02a State :Colorado <br />_-12/23/2004 <br />SSS <br />County :Delta <br />Site :Delta Pavino Gravel Pit <br />Agency or organization name :OMG <br />Permit or otherjob action :Routine Bond Recalculation <br />Task description :Pond inslope highwal <br />HOURLY EQUIPMENT COST <br />reduction <br />Basic machine :Cat D8R Series II - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $31.76 NA <br />Total unit cost hour : $146.67 Total fleet cost/hour : $146.67 <br /> <br />MATERIAL QUANTITIES ;: <br />Initial Swell Loose <br />volume : 17,253 LCY <br />factor: NA volume: 17,253 LCY <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 10.00 % (i <br />Average site altitude : 4,980 feet <br />Material weight : 3,250 Ibs/LCY <br />Weight description <br />Gravel - Pitrun <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.270 /LCY <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient: 1.22 <br />Altitude : 1.00 <br />Material weight : 0.71 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />Adjusted unit production : 543.98 LCY/hr <br />Adjusted fleet production : 543.98 LCY/hr <br />Total job time : 31,72 Hours <br />Total job cost : $4,652 <br />Permitfjob# : M-1998-105 <br />Abbreviation :none <br />Filename : M105-02a <br />
The URL can be used to link to this page
Your browser does not support the video tag.