Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task no.: 01a <br />Date :_ 12/23/2004 <br />User SSS <br />State :Colorado <br />County :Delta <br />Site :Delta Paving Gravel Pit <br />PermiUjob no.:M-1998-105 <br />Abbreviation :none <br />Filename : M105-O1a <br />Agency or organization name DMG <br />Permit or other job action :Routine Bond Recalculation <br />Task description : Dewater phase I and /l lakes for inslope grading <br />HOURLY EQUIPMENT COST <br /> <br />Description Quantity Data <br />Source <br />Pump : Centrifugal pump, 12.0 in. 1 (CRG) <br />Suction hose : Suction pipe, 12 in. diam., 25 fl. L 4 (CRGJ <br />Discharge hose : Discharge pipe, 12 in. D, 25 fl. L 4 (CRG) <br />Labor: NA 0 NA <br />Cost Breakdown : Job Utilization <br />Ownership cosUhour : $21.01 NA Job shift basis : 1 per day <br />Operatingcost/hcur : $15.28 100 % Horsepower : 90 <br />Operator cosUhour : $0.00 NA Weight (UST) : 2.60 <br />Total cosUhour : $36.29 <br /> Total fleet cosUhour : $36.29 <br /> <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume: 52,950,719.00 gallons factor: 1.0000 volume: 52,950,719 gallons <br />Total pond inflow surface <br />area : 60,710 sq. ft. <br />Source of volume estimate <br />Unit inflow rate in <br />gph/sq.ft.: 0.0879 <br />bond calculations <br />Total pond inflow volume <br />per hour: 5,336.41 gph <br />PUMPING TIME ~ ~~ ~ ~ ~~ ~- - ~~~ <br />Rated pump capacity : 350,000 gph/pump Total pumping capacity : 350,000 gph <br />Initial unadjusted pumping time : 151.29 hours <br />Inflow as % of pond volume : NA % Inflow during initial pumping timf 807,333 gallons <br />Net unadjusted pumping time : 153.59 hours <br />Pump efficiency factor : 0.9167 (55 min./hr.) <br />Total adjusted pumping time : 167.55 hours <br />......................................... . <br />JOB TIME AND COST <br />Total job time : 167.55 hours <br />Unit cast : $0.000113 per gallon Total job cost : $6,081 <br />