Laserfiche WebLink
~i <br />Geotechnical Data Technical Memorandum <br />Hazeltine -Road Runners Rest II Gravel Pit Lining Project <br />December 2000 <br />7. Excavated and logged 8 test pits in the berm between the Hazeltine and Howe- <br /> Hailer Pits. <br />8. Excavated and logged 4 test pits in the floor of the Hazeltine Pit. <br />9. Excavated and logged 7 test pits in stockpiled materials on the Hazeltine site. , <br />10. Collected bulk samples from stockpiled material on the Howe-Haller site. <br /> <br />11. Collected bulk samples from the Hazeltine and Howe-Haller tailings ponds. <br />12. Prepared a series of laboratory testing programs and performed laboratory tests 1 <br /> on representative soil and bedrock samples from the borings, test pits, and bulk - <br /> samp]es. ' <br />13. Prepared this Geotechnical Data Technical Memorandum that presents the data <br /> collected. ;• <br />1.3 Authorization <br /> <br />GEI performed the work described in this Technical Memorandum under the terms and <br />conditions of Agreement 05060A, entered May 5, 1998 and amended September 1, 1998, <br />between GEI and the City and County of Denver, a municipal corporation of the State of ' <br />Colorado, acting by and through its Board of Water Commissioners. <br />1.4 Project Personnel <br />Personnel from GEI responsible for the completion of this work included: ' <br />Project Manager Robert J. Huzjak, P.E. <br />Project Geotechnical Engineer Scott R. Cooper, P.E. <br />Staff Geotechnical Engineer Diane K. Reichler, E.I.T. <br />Field Engineer Don B. Lopez, E.I.T. <br />Field Engineer Eric M. Johnson, E.I.T. <br />Technical Reviewer Gonzalo Castro, Ph.D., P.E. <br /> <br /> <br />GEI Consultants, Inc. 1_2 ne_isaro,m.oa <br />