Laserfiche WebLink
The License Agreement between PSCo and Pathfinder signed by George Vonesh, Jr. on <br />behalf of PSCo and signed by Scott Smith on behalf of Pathfinder April 10, 1996. (This <br />License Agreement, paragraph #13, refers to the Licensee maintaining a minimum cover <br />of five (5) feet over the Licensor's Pentock; it is acknowledged that this License <br />Agreement has since been suspended.) <br />The Memorandum from Norm Aufderheide, County Engineer to Mike Rozycki, Planning <br />Director, dated June 13, 2003, concerning Pathfinder Penstock Crossings. <br />The Memorandum from Norm Aufderheide, County Engineer to Mike Rozycki, Planning <br />Director, dated June 26, 2003, concerning Pathfinder Phase III -Drainge Report and <br />Stormwater Development Plans. <br />The FAX Memorandum from Dave Leonazd P.E. to Norm Aufderheide, County <br />Engineer, dated July 10, 2003 concerning, the drainage study and detention plans. <br />The Memorandum from Norm Aufderheide, County Engineer to Mike Rozycki, Planning <br />Director dated July 21, 2003 concerning acceptance of the revised Sheet 4 of the Phase <br />III plans for the Penstock Crossing, the Drainage Report and Storm Water Development <br />Plans and the Geotechnical Evaluation for slope stability. <br />Development Permit Issuance Da e: July 22, 2003 <br />Michael Ro cki, Planning Director <br />[texUpatltfmder/dev.permit.phaselII] <br />[texUpathfmderldev.permit.phaseIIllPage 3 <br />