My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-05_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2003-02-05_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:41:08 PM
Creation date
11/21/2007 5:57:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Revision
Doc Date
2/5/2003
Doc Name
Request for Financial Warranty Reduction
From
Cotter Corporation
To
DMG
Type & Sequence
SR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Financial Warranty Reduction <br />Permit M-1977-300 <br />3 February, 2003 <br />Page 2 of 3 <br />TABLE A <br />Reclamation Work Completed for Permit M-1977-300 <br />Reclamation Work Descri tion Bonded Cost in dollars <br />Structure Demolition and Disposal ti <br />• Warehouse #1 Concrete Pad 7 231.00 <br />• Old Surface Sho 3 832.00 <br />- Old Surface Sho Concrete Pad 10 482.00 <br />- Old Surface Sho Wall Footer 685.00 <br />• Sullair Buildin 1 086.00 <br />- Sullair Buildin Concrete Pad 2 632.00 <br />• Core Libra Buildin Concrete Pad 7 859.00 <br />• Receiver Pads 2 006.00 <br />• Steel Rack Pad 773.00 <br />• Sho Wash Pad 2 030.00 <br />• Used Oil Containment 293.00 <br />• Concrete Dis osal dis osal of 862.06 d' out of 938.01 d' total 4 465.47 <br /> <br />Subtotal for Structure Demolition and Disposal 43,374.47 <br /> <br />Non-Demolition Reclamation Work Com leted <br /> <br />• Grade Office & Shop Area (completed 12/2002) 1,617.00 <br />• 190 T. Waste Haul 25 mi. 1,805.00 <br />- Load (waste) _ $1,685.00; Dump Charge (waste) _ $5,700.00 7,385.00 <br />• Alp(h)a Survey: 135 hr. @ $20/hr. 2,660.00 <br />• 60 T, Haz Waste > Canon City <br />- Clean-up Disposal @ $135.00 / T. 8,100.00 <br />- Transport @ $4.25 truck/mi. X 3.333 trucks X 145mi. 2,054.00 <br />• Boneyard Cleanup (543,361 lbs. = 272 T.) <br />- Load @ $8.87 T. (yd') X 272 T. 2,413.00 <br />- Haul @ $0.38 yd'-mi. X 272 yd' (T.) X 25 mi. 2,584.00 <br />- Dump charge Z72 yd' (T.) @ $30 T. 8,160.00 <br />• Purchase Topsoil (16,395 cu. yds. used @ $5.00 per cu. yd.) 81,975.00 <br />• Spread Topsoil (16,395 cu. yds. placed @ $0.45 per cu. yd.) 7,377,75 <br />• Rip Area to be Seeded (32 acres @ $253.5615 /acre) 8,113.97 <br />• Steep Slope Hydroseed (12 acres @ $1,276.60 /acre) 15,319.20 <br /> <br />• Seal Exhaust Borehole (completed 11/2002) 5,030,00 <br />• Seal Babcock (Jeffrey) Borehole (completed 10/2002) 5,030.00 <br /> <br />Subtotal for Non-Demolition Reclamation Work 159,623.92 <br /> <br />Total for Reclamation Work Completed Since 02/16/2002 202,998,39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.