Laserfiche WebLink
Since the East Pit Disposal Area has not changed and only the <br />designation has changed for Waste Rock Disposal Areas B and C <br />(formerly Areas C and D), these costs were taken from the approved <br />permit and are summarized below. <br />East Pit Reclamation Costs S 129,580 <br />Waste Rock Disposal Area B 60,299 <br />Waste Rock Disposal Area C = 120,820 <br />Costs for the new or revised waste rock disposal areas are <br />presented below. <br />A. Waste Rock Disposal Area A <br />3.1 acres of outslopes, 19.2 acres total <br />3.1 acres x 54,776/acre = 514,806 <br />19.2 acres x 51,703/acre - 532,698 <br />TOTAL COSTS FOR WASTE ROCK DISPOSAL AREA A - S 47,504 <br />B. Waste Rock Disposal Area D <br />18 acres of outslopes, 42 acres total <br />18 acres x f4,776/acre = 585,968 <br />42 acres x 51,703/acre 571,526 <br />TOTAL COSTS FOR WASTE ROCK DISPOSAL AREA D = S 157,494 <br />C. South Waste Rock Disposal Area <br />40 acres of outslopes, 125 acres total <br />40 acres x 54,776/acre = 5191,040 <br />125 acres x 51,703/acre 5212,875 <br />TOTAL COSTS FOR SOUTH WASTE ROCK DISPOSAL AREA = f 403,915 <br />TOTAL WASTE ROCK DISPOSAL AREA COSTS f 919,612 <br /> <br />~~ <br />.\ <br />L-2 <br />