'~ w <br />EXHIBIT L - RECLAMATION COSTS <br />13.1 Reclamation Costs <br />Revised reclamation bonding costs are presented with this <br />amendment. These costs have been calculated using the rental costs <br />and assumptions previously approved by the Division and contained <br />in Exhibit L of the original permit document. The costs requiring <br />revision are costs associated with waste rock disposal area <br />reclamation, tailings reclamation, and some sampling costs contained <br />under miscellaneous costs. Since seeding costs were calculated for <br />total disturbed area, these costs have also been revised. The cost <br />for heap leach reclamation has been eliminated from the total <br />presented. <br />The total cost estimate for reclamation of the San Luis Project <br />is S 3,273,762. Although the costing in the approved permit was <br />based on a two phase approach, the submitted bond was the worst case <br />bond and not the Phase 1 bond. This amendment presents only the worst <br />case costs. <br />13.2 Waste Rock Disoosal Areas <br />Waste rock disposal area reclamation costs are shown for each <br />waste rock disposal area. Waste rock disposal areas will cover a <br />total of 254 acres including the East Pit. Dump outslopes will be <br />regraded to approximately 3H:1V prior to topsoil replacement. <br />Disposal area reclamation costs have been calculated using the <br />assumptions previously approved and outlined below for outslope <br />grading, topsoil replacement and topsoil grading. <br />Total Outslope Reclamation Costs/Acre E4,176 <br />Total Topsoil Replacement and Regrading Costs/Acre = SI,703 <br /> <br />L-1 <br /> <br />