My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-29_REVISION - M1980047 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980047
>
2007-08-29_REVISION - M1980047 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:22:57 PM
Creation date
11/21/2007 5:38:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
Revision
Doc Date
8/29/2007
Doc Name
Response to DRMS comments
From
Exxon Mobil Corporation
To
DRMS
Type & Sequence
AR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cciory Snare Oil Pw,ra Co~cmdo !AIRB Para-r M-23003) Rev Aug 2~, 2007 <br />2000 Nte rio7.Uea Straus Sur••rrary anr. Requos:'w Reduct~n m At!oaed Aprnage <br />a.3 t Of'-sde Access Roads tISP Areas 3A 36 and 3C) <br />This area encompasses a total of 42 acres of acive roaCway and roaCSlde cW and fill <br />slopes on property formerly owned by Unocal. anC now owned by Encana Approximately t4 <br />acres of this total s active roadways surface. and the remainder ~s roadway cut and GII side <br />slopes. ExxonMobifs right-of-way agreement that allowed for construction of this road and an <br />atllacent pipet,ne ngh4of-way granted ExxonMobil onry the right to consirucl and operate these <br />fac,lit~es on land whose ownership remained with Unocal These !ands were later purchased by <br />Encana, a natural gas exploraUOn and production company. ExxonMob~l amendeC the mining <br />permit to include this roadway m 1981, and proceedeC to construct the road In accordance ~.vith <br />the terms of the permd Permanent reclamaGOr. was carried out on alt disturbed areas ~.vtrere <br />construction was complete. However, tha agreement that allowed ExxonMobd to construct Irns <br />and Exxunh1obd r <br />own regardless of EX%OnMObil'S mining perms <br />The approx;mate hinds of the 2.5 mde access roadway ISP Area 3 are depicted on <br />Exhibit F•2. Area 3 s subdwided into areas 3A 36 and 3C as shown on ExhiCit F-2, Current <br />conditions in these areas. inWuding present construction acbvRy by others, are dep,ctetl m <br />Figures t8 through 22. The de5cr pUOn here begins near the southern end of this road where ~t <br />departs from the publo road CR 215, and progresses northerly about 2.5 mites to Colony's <br />southern property tine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.