Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description CosUhour/unit (No. units) CosUhr/neet Cost/hr/8eet <br />-Light Duty Pickup, 4x4, 3/4 T. $43.41 1 $43.41 $43.41 <br />-Mud service pump station, 225 psi $32.98 1 $32.98 $32.98 <br />-Fue/Tanker, 4x2, 170 HP $55.00 1 $55.00 $55.00 <br />-Luba Truck, 4x2, 170 HP $63.32 1 $63.32 $63.32 <br />Subtotals : $194.72 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.67 0.67 Total non-roadable mob/demob cost ` <br />Return time (hours) = 0.67 0.67 'two round trips wiN haul dg <br />Loading time (hours) = 2.00 NA Total roadable mob/demob cost " <br />Unloading time (hours) = 2.00 NA •• one round tdp, no haul dg <br />Subtotals = 5.33 1.33 <br />Denver <br />30.0 miles <br />45.0 mph <br />$fo,sos.21 <br />$259.63 <br />JOB TIME AND COST Total job time : 10.67 hours <br />Total iob cost : 510.868 <br />