Laserfiche WebLink
Permit or other job action :Am-01 <br />Task description :MOblllZallOn Initial <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway flock tractor, 6x4, diesel powered, 400 HP (2nd hall, 2005) <br />Truck trailer description :Generic /olding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />' ` Available rig.capacitips ~ 0-2~ons_ 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $25.36 R$Z . $3~.8~ <br />Operating cosUhour ~ $38.07 $39.54 ~ $43.02 <br />Operator cosUhour : $27.40 $27.40 $27.40 <br />Helper cost/hour : $0.00 $21.55 $21.55 <br />Total Unit Cost/hour : $90.83 $116.61 $126.50 <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/geet Retum Trip <br />CosUhr/fleet DOT permit <br />Cost/fleet <br />-Cat D10R- 10SU 91.22 $79.58 $126.50 2 $412.15 $253.00 $0.00 <br />-Cat 627G 40.90 $46.97 $116.81 2 $327.15 $233.22 $0.00 <br />-Reveo. Eo. 20.00 $80.00 $90.83 2 $301.68 $181.88 $0.00 <br />Subtotals : 51,040.97 5867.88 50.00 <br />