Laserfiche WebLink
90 01-'0 `.+ 1914 <br /> <br />BATTLE MOUNTAIN RESOURCES, SAN <br />CMLRD ADEQUACY LETTER RESPONSES <br />Page 2 of 28 <br />3 303 535 994? SFY• GENVEk <br /> i <br />LU15 PROJECT <br />The emergency response plan identified 6,500 gallons of sulfuric acid <br />as being located on site. At expected production levels, what is the <br />daily requirement or consumption of sulfuric acid? W111 sulfuric acid <br />be used as a detoxifying reagent in an emergency spill situation? <br />RESPONSE: The sulfuric acid consumption levels <br />ton of ore processed. This consumption <br />1n ore type. At the expected rate of <br />tailings production, this would be 2.8 <br />16, the sulfuric acid will be used in <br />slurry prior to tailings disposal. The <br />as a detoxifying agent in an emergency <br />to question 4). <br />are estimated at 1.2 lbs per <br />will vary with tha variations <br />4,680 tons per eay (TPD) of <br />7PD. As mentione~i on page D- <br />the treatment of `he tailings <br />sulfuric acid will not be used <br />spill situation (¢ee response <br />Hydrogen peroxide and alkaline chlorination ere referenced for use <br />1n the emergency response plan for cyanide detoxification. What <br />reagent will be used far alkaifne chlorination? With reference to <br />Table 4.1 in the emergency response plan (Exhibit M), N+hat volumes <br />of reagents will be available for detoxification purposes? What <br />corresponding volumes of spil)s will be detoxified by the amounts <br />of reagents stored on site? <br />:'~•'"`Sf: The reagent used for alkali„e chlorination will be calcium <br />hypochlorite. The volume of calcium. hypochlorlte stored onsite is <br />expected to be 2,000 lbs (1 ton). This quantity should be sufficient <br />to detoxify any spill that could possibly occur and, as discussed <br />in the response to question 5, any spill would be completely <br />contained within the facility. The volume of spill to bE• detoxified <br />will vary depending on the point 1n the process wher~a the spill <br />~r-~lrs and the characteristics of the ore under leach. <br />_:~ provide the mill facility design criteria to demonstrate that <br />solution or chemical spill would not discharge from ilia facility. <br />'uor construction, Internal curbing, solution collectioi and backup <br />~jstem design specifications should be submitted. <br />;;5.-r Attachment 2 is included to provide preliminary design criteria for <br />the mill facility internal curbing, Final designs will ke submitted <br />prior to construction. <br />0a <br />