Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER-ONLY WORK <br />Agency or organization name : DMG <br />Task # : 07a State :Colorado PermiUjob # : M-1978-323 <br />Date : 7 7/21/2006 County :Mesa Abbreviation :none <br />User : GRM Site : Woodring Pif Filename : M323-07a <br /> <br />Permit or other job action : Final Reclamation Liabilty Update - 2006 <br />Task description :Spread tgpS011 Over plt flOOr <br /> <br />HOURLY EQUIPMENT COST <br /> Model :Cat 623G Shift basis : 7 per day <br />Cost Breakdown <br />Ownership cosUhour : 567.15 <br />Operating cosUhour : 594.82 <br />Operator cosUhour : $32.96 <br />Total unit cosVhour : $794.93 <br />MATERIAL QUANTITIES <br />Job utilization <br />NA <br />700 <br />Initial Swell <br />volume: 9,075 LCY factor: <br />Source of quantity take-off :accepted 2000 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Haulino Capacity <br />NA <br />Total Fleet cosUhour <br />Horsepower 365 <br />Weight (UST) : 40.92 <br />Cost data source : (CRG) <br />$389.86 <br />Loose <br />volume: 9,075 LCY <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight: 2,650 pounds/LCY Struck volume: 78.00 LCY <br />Material description : Heaped volume : 23.00 LCY <br />Decomposed rock - 25% Rock, 75% Eanh Average volume : 20.50 LCY <br />Rated payload : 55,000 pounds <br />Payload capacity : 20.75 LCY Adjusted capacity : 20.50 LCY "' <br />Cvcle Time (load + haul + spread + return) : Loading time : 0.90 minutes ` <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : • loading nme per pair on push-pun models <br />Route I Distance (feet) Grade (%) I Roll. res.(%) ~ Total res.(%) Velocity (fpm) I Travel time (min.) <br />Haul: 200 0.0 5.0 7,292 <br />5.0 0.25 minutes" <br />Return: 200 ~ 0.0 5.0 ~ X <br />5.0 i L,359~ 0.08 minutes" <br />° (revel time atl~ustetl for acceleration and deceleration al loatl antl tlump points <br />velocities are max.a¢ainaple per total resi stance shown, not average Total cycle time 1.94 mlOUteS <br />Job Condition Correction Factors <br />Site altitude (feet) : 5,400 ; Dusted Hourly Production <br />Altitude adjustment factor : 7.00 (Cat HB) ~ Unadjusted unit production : 634.28 LCY/Hour"' <br />Job efficiency factor : 0.83 (1 shifl/day) Adjusted unit production : 526.46 LCY/Hour <br /> Adjusted fleet production : 1,052.91 LCY/Hour <br />Net job correction factor : 0.83 °' z emea vowme on pusn-pun rtpaels <br />JOB TIME AND COST <br />Fleet size : 2 Scraper(s) Total job time : 8.62 Hours <br />Unit cost : 50.370 /LCY Total job cost : $3,360 <br />