My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-11-21_REVISION - M1978323 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978323
>
2006-11-21_REVISION - M1978323 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 5:25:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978323
IBM Index Class Name
Revision
Doc Date
11/21/2006
Doc Name
Reclamation Liability Update - 2006
From
DRMS grm
To
Woodring Pit
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cosf Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 06a State :Colorado Permit/job# : M-1978-323 <br />Date : U/21/2006 Counly :Mesa Abbreviation :none <br />User : GRM Site :Woodring Pit Filename : M323-O6a <br />Agency or organization name :DRMS <br />Permit or other job action :Final Reclamation Liability Update - 2006 __ _ _ <br />Task description :push topsoil off top of highwall to pit floor <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine :Cat D9R - 9U (2005) Horsepower :_ 405 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />Ownership costlhour : $73.28 NA <br />Operating costlhour : $99.23 100 <br />Ripper op, costlhour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $205.30 Total fleet costlhour <br />$205.30 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 8,067 CCY factor : 7.125 volume : 9,075 LCY <br />Source of estima ted volume :accepted 2000 volume <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 65 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,849.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (l shift/dal <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (negJ Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,400 feet Material weight : 0.90 ~ (Cat HB) <br /> Blade type : 1.00 I (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.45 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 829.39 LCY/hr <br /> Adjusted fleet production : 829.39 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 10.94 Hours <br />Unit cost : 30.248 /LCY Total job cost : $2,246 <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.