11) Under the Reclamation Cost Exhibit L it is noted that only partial pumping will be conducted. At <br />least one slope will have to be established from toe to crest therefore it must be assumed that the <br />entire volume will have to be pumped. Please clarify discrepancy. <br />12) From the Mining and Reclamation text it appears that there will be no isolation of Phase 11 from <br />other mined areas. Please clarify whether pumping estimates include pumping the entire mined <br />area of 211.03 acres or just the 25.48 acres noted in the mine plan for Phase 11. <br />13) Please provide a break down of demolition costs. In order to provide an accurate estimate the <br />size and dimensions of buildings, footers and concrete structures must be provided. <br />This is a Preliminary Adequacy Review. Other issues and continued clarification of those noted may <br />require additional information and further review. The tentative Decision Date for this application is set <br />for July 3151, 2007 provided all issues have been addressed and there are no objections received. <br />If you need additional information, please contact me at the Division of Reclamation, Mining and <br />Safety, Grand Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado 81501, <br />telephone no, 970.241.1117. <br />Sincerely, <br />~~~Gl~y~~~iO' <br />G. Russell Means <br />Environmental Protection Specialist <br />