Laserfiche WebLink
4.3.4 Site 3 Environmental and Cost Effects <br />Table 16. Site 3 Habitat Evaluation Scores <br />SITE 3 Existin FWOP FWP, Sl FWP, S2 FWP, S3 <br />1 A uatic Barriers 16 16 19 18 18 <br />2. A uatic Cover 10 10 14 IS 15 <br />3 Velocity/Depth Regimes 14 12 17 19 19 <br />4 Flow Continui 14 14 17 17 17 <br />5 Channel Alteration 4 4 18 19 19 <br />6 Channel Sinuosi 4 4 11 12 12 <br />7 Bank Stabili (Left) 4 4 9 10 10 <br />7 Bank Stabilit (Ri t) 3 3 8 10 10 <br />8 12i azian Ve elation Cover 8 7 16 18 16 <br />9 Ve . Struc. Div. (Left) 5 4 8 9 8 <br />9 Ve . Struc. Div. (Right) 8 7 8 8 8 <br />10 %Native Ve . (Left 4 4 7 9 8 <br />10 %Native Ve . (Ri ht 5 S 7 8 7 <br />11 Wetland Function 8 8 16 19 19 <br /> <br />Aquatic Score <br />(Sum of Scores 1-7) x 50 / 140 24.5 23.4 40.4 42.6 42.6 <br />Terrestrial Score <br />(Sum of Scores 8-11) x 50 / 80 24.1 22.7 39.0 45.0 41.7 <br />Habitat Score <br />Maximum Value = 100 48.6 46.2 79.3 87.6 84.4 <br />Habitat Units <br />Habitat Score x Project Area 4864 4624 7855 7095 6902 <br />'FWOP=Future Without-Project, FWP=Future With-Project, <br />S1=Scale 1, S2=Scale 2 <br />Table 17. Site 3 Summary Cost Estimate <br />Descri lion First Cost O & M -Life C cle Cost <br />No Action $0 $0 $0 <br />Site 3, Scale 1 $3,571,794 $109,290 $3,681,084 <br />Site 3, Scale 2 $2,138,657 $80,660 $2,219,317 <br />Site 3, Scale 3 $1,400,556 $65,290 $1,965,846 <br />33 <br />