Laserfiche WebLink
I PYiase Nb Weekly Summary No. 8 Page 3 003-2203 <br />Golder observed placement of LVSCF full time for correct material, road thickness, placement <br />thickness, drop height, taper, and liner damage. LVSCF was placed in accordance with the <br />specifications. <br />Golder observed placement of Low Volume Solution Collection piping for proper materials, <br />connections, and location. <br />Golder observed and documented confirmation drilling activities associated with the Phase IV <br />construction. Full-time monitoring was given to confirmation drilling of underground workings, <br />including logging holes, mazking drill locations, surveying holes, and documenting underground <br />workings encountered. <br />Laboratory Tests <br />Golder obtained four samples of LVSCF (LVSCFb-O5, 06, 07, and 08) for laboratory testing. The <br />samples tested met the requirements of the specifications and results aze presented in Attachment B. <br />Meetines <br />CC&V held a Weekly Contractors meetings on January 8`s. Items discussed included Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on January 21~`, 2003 at <br />] 0:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br />~~~~ <br />Ron DiDonato <br />Resident Interim CQA Monitor <br />PlieaelVb 81anQ5-1$2003.doc Golder Associates Inc. <br />