My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-01-28_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-01-28_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:52 PM
Creation date
11/21/2007 5:17:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/28/2003
Doc Name
Weekly Const. Report
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ASSOC121teS <br />January 21, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303)985-2080 <br />Golder Project No.: 003-2203 <br />RECEIVED <br />JAN 2 81003 <br />12E: Summary No. 8: January 5 through January 18, 2003 Division of Minerals and Qeoio~r <br />Cresson Project Ptrase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of January 5"' <br />through January 18m, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 4° F to 23° F, and highs ranged from 28° F to 53° F. No precipitation was <br />recorded during this reporting period. Weather observations were made on nine days of this two <br />week reporting period. <br />Construction Svnopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb and <br />c construction. Ames conducted Phase IVb and c construction activities on nine days of this fourteen <br />day reporting period (January 5th through January 18'~. <br />Constnuction activities conducted during this reporting period are shown in site maps of Phase IVb and <br />IVc, located in Attachment A. <br />Phase IVb <br />Ames corrtinued placement of Low Volume Solution Collection piping. Ames placed 4-inch slotted <br />PCPE pipe in the locations defined by the plan drawings. Placement of the piping layout will wrrtirtue <br />as placement of the LVSCF material progresses to the east. <br />
The URL can be used to link to this page
Your browser does not support the video tag.