Laserfiche WebLink
<br />ASSOC121teS <br />January 21, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303)985-2080 <br />Golder Project No.: 003-2203 <br />RECEIVED <br />JAN 2 81003 <br />12E: Summary No. 8: January 5 through January 18, 2003 Division of Minerals and Qeoio~r <br />Cresson Project Ptrase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of January 5"' <br />through January 18m, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 4° F to 23° F, and highs ranged from 28° F to 53° F. No precipitation was <br />recorded during this reporting period. Weather observations were made on nine days of this two <br />week reporting period. <br />Construction Svnopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb and <br />c construction. Ames conducted Phase IVb and c construction activities on nine days of this fourteen <br />day reporting period (January 5th through January 18'~. <br />Constnuction activities conducted during this reporting period are shown in site maps of Phase IVb and <br />IVc, located in Attachment A. <br />Phase IVb <br />Ames corrtinued placement of Low Volume Solution Collection piping. Ames placed 4-inch slotted <br />PCPE pipe in the locations defined by the plan drawings. Placement of the piping layout will wrrtirtue <br />as placement of the LVSCF material progresses to the east. <br />