<br />EXHIBIT E RECLAMATION PLAN <br />The Haxtun Soil Conservation District has given us their recommendations for <br />reclamation of the mine site after extraction of gravel is complete. We will do as they <br />recommended. <br />Top soil to be replaced at a six inch depth will be stockpiled away from the flow <br />of water and reseeded to Lincoln Smooth Brome at the rate of 13 pounds per acre with <br />a nurse crop of 5 to 10 pounds of oats per acre while the mining is taking place. This <br />should reduce the chance of wind blowing the topsoil from the piles. <br />As increments of 3 acres are completed having the gravel extracted , <br />reclaiming will begin. The banks which have been disturbed will be sloped to a <br />maximum of 3:1 slope. Overburden and dirty gravel will be used 'rf needed to <br />acxommodate this. After scarifying the graded slopes, six inches of topsoil will be <br />spread over the disturbed area. A cover crop of hybrid forage sorghum will be seeded <br />before July 1 at at the rate recommended by SCD. Grass seeding will be done <br />between November 1 and May 1 when there is at least 8" to 12" of stubble to seed <br />grass into. The creek channel will not be seeded, as run off would wash away any <br />vegetation which might try to become established. <br />Reclamation will first be done at the north bank on the east end of the affected <br />area. See map which indicates a 2.9 area staked off by posts, which will be mined <br />first. We anticipate this extraction to take approximately 2 years, depending on our <br />demand for gravel. Increased business could accelerate this time table. <br />Most of the south bank will not be disturbed, as the gravel deposits mostly seem <br />to be to the north. The property owner, who is 92 years old and had the property since <br />before the 20's, says that that creek bed used to be very wide. The flow of the creek <br />has moved to the south bank, away from the normal creek bed channel as gravel has <br />been deposited to the north. After reclamation the flow should be returned more <br />closely to the original position. <br />If any of the banks are disturbed when channeling the water, they will also be <br />sloped in the same increments and reclaimed. As the mining advances to the west In <br />the creek bed, the sides wilt be reclaimed at 3 acre increments. The channel will <br />continue to be directed to flow away from exposed gravel deposits as needed until <br />reclamation is completed . All disturbed banks will be sloped to the creek bed. <br />The roads, including areas of truck traffic within the permitted area, will have <br />any gravel base added removed and the ground will be scarified. Topsoil, as needed <br />up to 6 inches, will be spread over the road area and reseeded according to SCD <br />recommendations mentioned above. <br />EXHIBIT E RECLAMATION PLAN <br />14 <br />