Laserfiche WebLink
secured. The state engineers office letter, submitted in response to this application would seem to <br />indicate that these water rights are not in place. <br />ADEQUACY ISSUES -Remaining after partial response to the second adeguacv review <br />1. Response acceptable. <br />Exhibit A - Leoal Description <br />2. Response acceptable. <br />3. Response acceptable. <br />4. Response acceptable. <br />5. Response acceptable. <br />Exhibit C -Pre-mine and Mine Plan Maps <br />6. Please provide pre-mine maps with the required vegetation information. <br />7. Response acceptable. <br />8. Response acceptable. <br />9. Response acceptable. <br />10. Response acceptable. <br />Exhibit D -Mine Plan <br />11. Response acceptable. <br />12. Response acceptable. <br />13. Response acceptable. <br />14. Response acceptable. <br />15. Response acceptable. <br />16. Response acceptable. <br />Exhibit E -Reclamation Plan <br />17. Response acceptabie. <br />18. Response acceptable. <br />19. Response acceptable. <br />20. Response acceptable. <br />