Laserfiche WebLink
3.2 Wetlands Affected <br />The total amount of jurisdictional wetland area that would be affected by this project is 0.09 acres. <br />Of the 0.09 acres, approximately 0.04 acres are the result of filling for proposed access roadway <br />crossings at Monument Creek and the tailwater ditch. Approximately 0.05 acres of wetland would <br />be filled during Processing Site preparation when 4 ponded areas are filled. <br />