Laserfiche WebLink
JUL-22-04 09:34AM FROM-TRAN3IT MIX CONCRETE CO <br />July 14, 2004 <br />Mr. Michael French <br />Pazk Manager <br />Lake Pueblo State Pazk <br />640 Pueblo Reservoir Rd <br />Pueblo, CO 81005 <br />Dear Mike, <br />719 475-0226 T-076 P.004/005 F-343 <br />7RYL4f®l ¢A <br />sw, a <br />p„t,.a..~rmJ <br />& 8 <br />TRANSIT MIX OF PUEBLO <br />This letter summarizes the points agreed to by Colorado Parks and Transit Mix of Pueblo <br />during our inspection of your land recently acquired from Valco, known as the Chain of <br />Lakes, related to the finalization of the reclamation as required by the Division of <br />Minerals & Geology. The meeting was conducted at 9:00 AM on July 13, 2004 on site <br />and attended by yourself and Mike Dowd of Colorado Parks, Berhan I~effelew of the <br />DMG, Mazk Heiliter, Transit's outside reclamation consultant, and Bill Pope, Pete <br />Melcher, Mark ICltme and myself, all of Transit. <br />Transit Mix of Pueblo is requesting full release of its reclamation responsibiliries from <br />the DMG and once the following items have either been accomplished or have a plan to <br />accomplish them; Colorado Parks will assist Transit in obtaining this release. <br />Item. l * Establish all survey points to Colorado State Parks satisfaction. <br />Item 2 * Eradicate all Russian Olives and Tamarisks on the requested release land, <br />except for those plants located in the CDOT drainage easement area just <br />• north of Highway 96 near the west side of the release area. This land was <br />not disturbed by the mining process and presently incorporates wetlands. <br />Removal would harm these wetlands as well as destroy a very pleasing <br />visual area. Furthermore, these species aze bound by the highway as well <br />as the drainage ditch which will limit their proliferation. <br />Item 3 * A. Modify the berm on the north side of the CDOT drainage ditch which is <br />located just north of Highway 96 near the west side of the release area. <br />Transit will seed the berm after modification and at the best rime to do so. <br />Item 4 * Remove one power pole at the first Litvak gate and replace it with another <br />post for the gate. <br />Item 5 No additional reclamation will be necessary on the road immediately to <br />the north of the southern most lake at the west end of the release azea. <br />Item 6 * A Groom the eastern most top soil pile and seed, when appropriate. The <br />remaining western azea located from the common boundary of Transit's <br />P.O. BOX 857 PUEBIA, COII)RA00 81002 FAX (719) 566.0231 PHONE (719) 561-8350 <br />