Laserfiche WebLink
July 2003 <br />36 Enterprises <br />Deakins Pit <br />Exhibit "E" <br />Reclamation Plan <br />A) Reclamation will be done immediately following the removal of gravel deposits. <br />Pond edges will be graded to a 2:1 slopes and will be irregularly shaped to promote <br />wildlife habitat and wetland habitat. Trees will be planted around edges of the pond <br />and reclaimed land will be covered with 6-10 inches of topsoil and reseeded. <br />Fourteen acres are to be reclaimed. Pond edges will be placed with a loader and <br />shaped with an excavator. <br />B) Post mining uses will be wildlife habitat and livestock grazing. Other land uses <br />in the area are heavy industrial and livestock grazing. <br />C) Reclamation plan will be implemented at the extraction of gravel deposits. <br />Phase 1 to be mined out from fall of 2003 to the fall of 2004. Reclamation of Phase I to <br />take place immediately following and to be completed by summer of 2006. After <br />placing and shaping of reclaimed land, 6-10 inches of topsoil will be spread across <br />reclaimed surfaces and will be seeded as follows per soil conservation office. Phase <br />III will not be disturbed until Phase I grading is complete and seed is paced. <br />D) N/A <br />E) i Affected land to be reclamed by the summer of 2006. <br />ii Phase 15.6 acres. <br />iii 1 overburden placement and slope rebuilding. <br />2 berm and edge of water shaping <br />3 topsoil placement <br />4 reseeding and shrub planting <br />F) i Slopes to be graded from 2:1 to 3:1. <br />ii 1 Sainfoin - 2.5 Ibs/acre <br />2 Bromine Smooth - 1.6 Ibs/acre <br />3 Intermediate Wheatgrass - 2.5 Ibs/acres <br />4 Pubescent Wheatgrass - 2.25 Ibs/acre <br />5 Orchard - 0.3 Ibs/acre <br />1 <br />