Laserfiche WebLink
July 2003 <br />3B Enterprises <br />Deakins Pit <br />Exhibit "D" <br />Mining Plan <br />A) Mining operations will follow current operations under 110 permit (No. 2001- <br />060). <br />B) 2 feet - 4 feet of overburden/topsoil will be removed to expose gravel deposit. <br />C) Water will be discharged from mine and used for irrigation before discharging <br />into the river bottom. <br />D) 10 acres. <br />E) The extra 2.4 acres being sought in addition to current operations will be mined <br />from fall of 2003 to fall of 2004. Reclamation of said mine to immediately follow <br />extraction of gravel deposits. <br />F) i 15 feet of pit run gravel to be mined at site. <br />ii Shale is at the bottom of the gravel seam. <br />G) Primary commodity is river rock gravel to be used in construction materials. <br />Secondary commodity to be fill dirt. <br />H) Pit run to be used in production of construction materials. <br />