My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-10-24_REVISION - M1986076 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986076
>
2003-10-24_REVISION - M1986076 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:28 PM
Creation date
11/21/2007 4:56:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
Revision
Doc Date
10/24/2003
Doc Name
Operators Adequacy Response
From
James Bender
To
DMG
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tailings IDisposal Bench <br />[Is the depressed azea where all dumped tails will be confined] <br />Yes, when it's full the currently approved site for tails will be re-utilized, as per the current plan. <br />[The stacking or vertical placement of the disposed tailings is not clearly explained. Please <br />describe the configuration of the lifts of tailings material to be placed on the bench, whether they <br />will be placed against the cut wall, and how close to the bench margin (the top of the outer fill <br />slopes) they will be placed] <br />--~ The tails will be placed against the cut wall. The tails will be placed in the cut to a depth of 2', at <br />which time 2' of soil, gravel, (approximately 15%) and larger rocks (approximately 35%) will be <br />placed upon the tails and mixed by compaction, by a backhoe, with a minimum of at least 4 <br />passes and or complete mixing and compaction are obtained. The 2' lifts are approximately the <br />height of a dumped bucket of tails, they will be dumped across the bottom, end to end, until the <br />length of the pond is full, then the soil and rocks, 2' will be added mixed and compacted. Before <br />a new 2' lift is started, the surface will be roughned to assure good bonding. The tails will be <br />stacked up to within 1' of the top of the lowest part of the pond. The last 1' to be compacted <br />topsoil and small waste rack, until the permeablity is 106 cm/sec., or less. Leaving a slight <br />depression across the top, the east and west ends will be sloped lower than the middle section of <br />the pond, to help water to run off of the azea. This will be covered by a 5' cap of waste rock, <br />mostly lazger size, and some soils, until the cover matches the surrounding countures 320-340. <br />Which is the same, as the current reclamation plan calls for. I'm committing to upholding the <br />conditions previously set forth in the file. <br />Tailin~,s Material to be Blended <br />[Ifyou are simply committing to make your tailings conform to the conditions previously set <br />forth in the file (in the DMG letter), please provide a statement clarifying this] <br />I am committing to make the tailings conform to the conditions previously set forth is the file. <br />Permeability of Cap Above Tailings <br />[Please verify whether you intended to state that eazlier permeability rate, or if you intended a <br />different rate.] <br />The permeability rate should be read 106 cm/sec., instead of 10. <br />Tailings Disposal Bench-Phased Expansion <br />[The drowings of the initial tailings disposal bench include a possible expansion to the east. I f <br />the initial tailings area is filled (assuming tailings materaial has been stacked high)and art <br />expansion is needed, how will you gain access to that azea? Please describe how and when an <br />expansion may be constructed. Across section diagram would be valuable in your response.] <br />Access to the proposed exapansion azea will be across the filled pond. The 5' cap would be left <br />off until the exppnsion is filled. The material from the expansion will be placed against the cut <br />wail, of the already filled pond for 4' to 5' outward, thus starting the 5` cover. This will still leave <br />plenty of room for an access road to the expansion azea on the outside of the bench. Once the <br />expansion area is full, then the rest of the 5' cap will be put on. <br />I doubt that the expansion area will be needed so, it would be built at the end of filling the first <br />stage of the pond, perhaps 2-3 yeazs, 2005. <br />
The URL can be used to link to this page
Your browser does not support the video tag.