Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL, Room 2t s C O L O 1tA D O <br />DenveG Colorado 80203 DIVISION O F <br />Phone: (30 31 8663 56 7 M I N E~ RA L S <br />FAX: 1303) 832-6106 G E O L O G Y <br />AlCLAMAT,ON•MINING <br />lAIITT•f CIf NG[ <br />gill Ovens <br />February 2, 2005 cn~m"r <br />Russell George <br />E><ecsnWe Director <br />Ronald w. tawny <br />Mrs. Karen and Mr. Ralf Topper Damian Darn. <br />9828 FaOen Rock Rd. "~"'~^~ t~r'~ <br />Conifer, CO 80433 <br />RE: Your Letters dated October 22, 2003 and September 27, 2004; and <br />December 7, 20tH E-mail Comments <br />on the June 14, 2004 Proposed DIMP Sampling Protocols <br />Cooley Reservoir & Fulton Wildlife Area Pit, Permit No. M•1999-034, AM-01 <br />Dear Mrs. and Mr. Topper. <br />The Division of Minerals and Geology has received and reviewed the above-referenced letters <br />regarding sampling activities and the proposed Well and Lake Sampling Protocols submitted_by Mr. <br />Molen on Aggregate Industries' behalf. Thank you for taking the time to provide your input. This letter <br />responds to your concerns and suggestions. <br />After receiving a copy of Tri-County Health Department's (°TCHD")'Standard OperaBng Procedures" <br />and °DIMP Sampling Procedure' from me an October 25, 2004, Mr. Molen revised the June 21, 2004 <br />proposed sampling protocols to incorporate applicable TCHD procedures. The Division reviewed the <br />latest proposed protocols dated December 14, 2004, in our letter to Aggregate Industries dated <br />January 21, 2005, which was copied to you. A review of that letter will reveal that the Division <br />addressed a number of your comments therein. Several items need to be worked out between you <br />and Aggregate Industries, induding: <br />1. Possible installation of a sampling port to avoid pump surging, and related ccets and timing <br />2. The routing and disposition of purged well water to minimize erosion and flooding <br />3. Adequate notification prior to the sampling event <br />4. Concerns regarding liability for damage to the well and pumping equipment <br />Please keep in mind that per the Board Order, Well No. 32883, will be sampled twice -once before <br />`~_ pit dewatering begins, and once after. There is no provision in the Order for long-tens monitoring of <br />~/C the well. However, Aggregate Industries must develop a plan, for approval by the Division, to monitor <br />the gravel pit pond water for DIMP monthly for one year, and then quarterly until authorized by the <br />Division to discontinue. <br />Addressino Issues Raised in vour October 22. 2003 Letter <br />The characteristics of DIMP are addressed to the Division's satisfaction in the latest protocols. As we <br />have discussed, my conversations with Colorado Department of Public Heakh and Environment <br />personnel in the Water Q/ua~ity Control Division and Hazardous Materials and Waste Management <br />.~c ai- issue ~~ w\ 2 ~ 9. ! D S ~ e {F2r ~'V'Dr^ 'tire '('o p Pe+'S -Fo D ~ (, . <br />Office of Office of Cobrado <br />Mined Land Reclamation ActWe and Inactive Mines Geological Survey <br />