Laserfiche WebLink
Permit or other job action :Reclamation Liability Estimate So-Ol 2007 <br />Task description :secondary seeding mobilization <br />EQUIPMENT TRANSPORT RIG COST ~ ~ Shift basis : ~ 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, SOT, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $16.63 $18.37 $22.33 <br />OperatingcosUhour: $44.38 $46.13 $50.07 <br />OperatorcosUhour: $27.66 $27.66 $27.66 <br />Helper cosUhour : $0.00 $25.39 $25.39 <br />Total Unit CosUhour : $88.67 $117.55 $125.45 <br />:, <br />NON•ROADABLE EQUIPMENT <br />Machine WeighUunit Ownership Haul Rig <br />Description (Tons) Cost/hr/unit CosUhr/unit .: <br /> <br />Fleet Size Haul Trip Retum Trip DOT permit <br />(No. units) CosUhr/fleet CosUhr/fleet CosUfleet <br /> <br />-reveg tractor 10.00 $25.00 $88.67 1 $113.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $113.67 $88.67 $0.00 <br />