Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description <br />Total <br />CosUhour/unit <br />Fleet Size Haul Trip <br />(No. units) CosUhr/fleet <br />Return Trip <br />Cost/hr/fleet sheet P of 2 <br />-Fla[bed Truck, 4x2, 15K GVW $48.11 1 $48.11 $48.11 <br />-Light Duty Pickup, 4x4, 3/4 T. $30.69 1 $30.69 $30.69 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $78.80 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : <br />Transportation Cvcle Time : Non- Total one-way travel distance : <br />Roadable Roadable Average travel speed : <br />Equipment Equipment <br />Haul time (hours) = 0.29 0.29 Total non-roadable mob/demob cost' : <br />Return time (hours) = 0.29 0.29 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " : <br />Unloading time (hours) = 0.50 NA "one round trip, no haul rig <br />Subtotals = 1.57 0.57 <br />JOB TIME AND COST Total job time : <br />Total job cost : $78.80 <br /> <br />Gunnison <br />10.0 <br />35.0 <br /> <br />$904.60 <br /> <br />$45.03 <br /> <br /> <br />3.14 <br />$950 <br /> <br /> <br />iles <br />mph <br /> <br /> <br /> <br /> <br /> <br /> <br />ours <br />