My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-19_REVISION - M1987027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987027
>
2006-07-19_REVISION - M1987027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:08:00 PM
Creation date
11/21/2007 4:38:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987027
IBM Index Class Name
Revision
Doc Date
7/19/2006
Doc Name
112c application
From
Colorado Quarries Inc
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~'^^-`-- ^c°~~ <br />~. <br />HARDSHIP LODE ~ ~ ~ t ~ ";;06 <br />Division mr nrnerals and Geela~y <br />EXHIBIT E- RECLAMATION PLAN <br />(1) Final grading shown on mine plan map. Revegetation per NRCS <br />specifications. Topsoil to be replaced to 6"-12" depth. <br />(2) Reclamation plan map <br />(a) Map shows areas of final slope configuration. 1:1 slope <br />and bench areas were designed due to natural topography <br />and to maximize product yield. All other areas will be 3:1 <br />slopes as shown which will be mined on this grade as to <br />minimize reclamation costs. Slopes will be mined from top <br />down and as an area is sloped and prepared, topsoil will be <br />replaced and seeded. This will keep disturbed area and <br />reclamation cost to a minimum. Benches shall be top soiled <br />and seeded as they are completed. 1:1 slope will not be top <br />soiled or seeded. <br />(b) Open range land constitutes this general area. Revegetation <br />and post mining will be in conjunction with this. <br />(c) As noted above, reclamation will proceed along with <br />mining. Final use will be for cattle and wildlife. <br />(d) Topsoil stockpile areas shown on map. Piles to be rounded <br />and walked in with a dozer for stabilization and seeded. <br />Replacement will occur as areas are prepared. Topsoil <br />replacement will be 6"-12" depth. Seeding will be per <br />NRCS specifications. <br />(e) As mentioned above, reclamation will occur as mining <br />progresses. Initial sloping and topsoil replacement should <br />commence in approximately 2-3 years and occur every year <br />thereafter. It is hard to delineate sizes of areas to be <br />reclaimed at any one time because slope and bench areas <br />have a lot less area than 3:1 slope areas. A good estimation <br />would probably be 1-3 acres per year. Areas could be <br />shown on annual maps. Final grade shown on map. <br />Topsoil replacement as noted will be at least 6"-12". All <br />revegetatiion shall be to NRCS specifications. <br />(f)(1) Shown on map. <br />(2) Per NRCS specifications. <br />(3) Per NRCS specifications. <br />(4) Per NRCS specifications. <br />(5) Stated above. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.