Laserfiche WebLink
~- the 302 lease could be delayed until mining ends and reclamation and maintenance <br />begins. <br />COMPLIANCE/MONTTORING (oodonat): It is recommended that compliance and monitoring <br />be conducted in joint inspections with both a DRMS and BLM present during the inspection. <br />NAME OF PREPARER: Dan Grenard <br />SUPERVISORY REVIEW: Paul Trentzsch <br />NAME OF ENVIRONMENTAL COORDINATOR: 3oe Vieira <br />DATE: 10/16/2006 <br />SIGNATURE OF AUTHORIZED OFFICIAL: ~ ~ ~' <br />R L. Masint ,Field Manager <br />DATE SIGNED: /~~ IT- c~ <br />I t- <br />23 <br />