My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-04-18_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-04-18_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 4:14:21 PM
Creation date
11/21/2007 4:23:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/18/1992
Doc Name
MEMO CHEMICAL ANALYTICAL MATRIX
From
BEI
To
BMG
Type & Sequence
TR3
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r+PR 10 '9~ 11~3~At~1 ~ <br />P.t <br /> <br /> <br /> <br />M E M O R A N D U M <br />T0: 8Mf3, San Luis <br />FROM: T.C. Shutt ~ <br />GATE: April 16, 1992 <br />SUBJECT: Addendum to Chemical Analytical Matrix <br />I em hoping that we now have the final design for the chemical analytical matrix. <br />I met with MLRD personnel (15th Apr11) and discussed our matrix design (of lkth <br />April). Their sue9estions have been incorporated into the attached matrix (dated <br />16th April) and include the following additions: <br />1. Once a week take a sample from the Collector pond and analyse for total <br />cyanide and WAD cyanide. <br />2. On the Monday and Wednesday samples (which are also tested by outside labs) <br />also analyze the collector pond sample for WAD and Cu. <br />This matrix (18th Apr11) will be reviewed one more time by MLRD bilfore they give <br />us final approval. <br />After discussions with Blaine Olson, I believe that i should explain (to clarify) <br />a few points in the analytical matrix, <br />1. The _"As is" samples taken on Monday and Wednesday need analyzing for free <br />(CN) ~1Y• <br />2. The "pH Ad,)usted" should be fully analysed according to the matrix. <br />3. The "As is" samples shall be taken on Wednesday, 15th Apr11 (already done) <br />and Monday, 20th April on1v. After that all samples taken an Mondays and <br />Wednesdays shall be "pH Ad,)usted" on1v. In other words - drop the "As is" <br />sampling on Wednesday, 22nd April. <br />4. When analyzing the Monday and Wednesday samples (on Wednesday and Friday <br />respectively) the pH and free (CN)~ ust be analyzed on the correct day; the <br />WAD and metals can be measured later if you run out of time. <br />BF/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.