My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-16_REVISION - M1999034
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999034
>
2003-05-16_REVISION - M1999034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:38 PM
Creation date
11/21/2007 4:20:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Revision
Doc Date
5/16/2003
Doc Name
Amendment
From
ADCO Consulting
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24. The approximate boundary between proposed final land uses of exposed water surface, <br />wetlands, and upland dry grass areas has. been clarified in the Exhibit E text and on the <br />EXHIBIT F SHEET 2 oft MAP. <br />25. All shallow wells within 600' has been clearly identified on EXHIBIT' C-1 SHEET 1 of 2 <br />MAP. Information and a colored map of these wells area are also included in EXHIBIT G. <br />26. The affirmative declaration in regard to applying for an NPDES permit has been added to <br />Exhibit G. <br />27. An additional letter from DOW along with a summary of responses to comments by DOW <br />has been included in EXHIBIT H. <br />28. The commitment to irregular shoreline and islands is not included in the proposed <br />reclamation: <br />29. To date none of the changes in the Amendment No. 1 application would lead to us revising <br />our estimated reclamation costs, and we concur this should be a separate item of discussion <br />after all of the other review items have been resolved. <br />30. The structures you have mentioned have been added to the text ofEXHIBIT S and EXHIBIT <br />D, as well as to EXHIBIT C-1 SHEET 2 of 2 MAP. How each structure is addressed in <br />included on EXHIBIT C-2 SHEET 2 of 2 MAP as well as in EXHIBIT D and EXIIIBIT S. <br />31. Ms. Topper's structures and wells have been identified on the EXHIBIT C-2 SHEET 2 of 2 <br />MAP. No mining is proposed within 200' ofthe structures on Ms. Topper's property without <br />an Agreement acceptable to the DMG with Ms. Topper, which AI does not anticipate <br />pursuing. This restriction has been idcluded on EXHIBIT C-2 SHEET 2 oft MAP, as well <br />as in the text in EXHIBIT D, EXHIBIT M, and EXIBIT S. <br />32. A revised Geotechnical Stability Exhibit to determine the minimum setback from the sewer <br />.line and structures along the east boundary south of the Xcel right-of--way are being prepared. <br />In the interim, notes on EXHIBIT C-2 SHEET 2 of 2 as well as the text in EXHIBIT•D, <br />EXHIBIT M, and EXHIBIT S prohibit mining within 200' in these areas until the Stability <br />Exhibit is accepted by the DMG. <br />The language in Stipulation No. 1 has been included~on EXHIBIT C-2 SHEET 2 of 2 MAP, as well <br />as in the text in EXHIBIT D, EXHIBIT G, and EXHIBIT M. In addition, we've included a similar <br />restriction on dewatering on EXHIBIT C-2 SHEET 2 of 2 MAP, as well as in the text in EXHIBIT <br />D,~EXHIBIT G, and EXHIBIT M <br />
The URL can be used to link to this page
Your browser does not support the video tag.