Laserfiche WebLink
6. A SHEET 1 has been added to each of the EXHI$IT C and F MAPS to depict the entire <br />existing permit area and the proposed amendment permit area. For each map exhibit, <br />SHEET 2 contains most of the details relevant amendment permit area only., <br />The-South Adams Water and Sanitation District sewer line has been added fo SHEET 2 bf <br />2 of both of the EXI-IIBIT G 1 and C-2 MAPS, and to the text in EXfI1BIT M, EXIBIT <br />O, .and EXHIBIT S. . <br />Structures within 200' ofthe permit boundary have;been identified on EXHIBIT C-1 SHEET <br />2 MAP.. <br />9:. These easements are shown on each of SHEET 2 of 2 EXHIBIT C and F-MAPS. <br />10. The intent is to partially dewater, but not fully dewater the lake area. No dewatering shall be <br />undertaken, until either an Agreement is:made with owner of any well within 600', or the <br />State Engineer's Office (SEO) app"roves partial de-watering. ,The requirement for an <br />` Agreement with we-1 owners within 600', or approval by the SEO for partial dewatering, has <br />been added to EXI-IIBIT C-2 SHEET 2 of 2, and the text has been modified in EXHIBIT D, <br />EXHIBIT G ,and EXHIBIT M. <br />11. The existing two Fulton Ditch crossings are have been identified on the EXHIBIT C MAPS. <br />These two areas are already disturbed with existing piping and internal roadways, and these <br />two crossing points remain after mining. Since these two crossings of the Fulton Ditch were <br />in existence prior to mining, no new disturbance will result from the addition of the <br />Amendment No. 1 area, and these two crossing areas will remain as private crossings across <br />the Ditch after mining in completed, these two crossing points need not be included in the <br />Amendment No. 1 area. It will be necessary to reach agreement with the Fulton Irrigation <br />Ditch Company on use of these two crossings for the conveyor and additional piping. The <br />requirement for the agreement and DMG'approval, prior to installation of the conveyor <br />crossing and additional piping, has been added to EXHIBIT C-2 SHEET 2 of 2, and the text <br />~in EXHIBIT D, EXHIBIT M, -AND EXHIBIT S. <br />12. Slopes maybe 1H:1 V and not be revegetated, if they are expected to be in placefor less than <br />1 year. Slopes shall be made a minimum of 3H:1 V and must be revegetated if they are <br />expected to remain more than 1 year. Both of these standards have been added to EXHIBIT <br />C-2 SHEET 2 of 2, and the text in EXHIBIT D. <br />13. The Plant Site is the existing plant that was approved in the original permit area application <br />and is shown on the EXHIBIT C AND F MAPS. No new conveyor or piping structures will <br />be constructed across 100's Avenue or outside the boundaries of the existing permit area. <br />2 <br />