COOLEY RESERVOIR AND FULTON WILDLIFE AREA PIT <br />AMENDMENT NO. 1 - JERONIlVIUS PROPERTY <br />(Revised 05/03) <br />EXHIBIT D -MINING PLAN (Continued) <br />The property was previously mined for sand and gravel resources by others. The property's present <br />configuration is two lakes and wetlands encompassing 28+ acres on the west, north, and south sides <br />of the property, and 20+ acres of non-lake area vegetated with non-irrigated grasses along the east <br />side. Most of the lake area is within 100 year flood plain of the S.Platte River, but the non-imgated <br />grass vegetation area is out of the flood plain. None of the flood plain area is considered part of the <br />flood way of the S. Platte River flood plain. <br />The addition of this property was primarily to obtain an area to dispose of the wash plant's discharge <br />water, as there are less than 500,000 tons to a depth of 30+_' of available sand and gravel resources <br />on the property since it was mined previously. The stratum below the grave( resources is pierce shale <br />bedrock. Mining will be one phase, and should be completed within 2 years. Except for minor <br />encroachment, the existing 10+_ acres of extensive wetlands area along southern boundary of the <br />south lake area shall be preserved. Reclamation shall include creation of additional wetlands area by <br />filling of lake area to 6" with silt from the plant's wash water above the existing high water lake <br />elevation, which generally occurs in the mid-June to mid-July time period, with silt from the wash <br />plant water. This filling will both allow the establishment of wetlands, and also will ensure there is <br />no adverse affect on the S. Platte River flood plain. <br />Mining of the two lakes areas will be undertaken with a dragline and/or large backhoe to recover any <br />remaining resources below the water level. The proposed mining includes partially de-watering the <br />lakes by 10' to 15'± ,but no dewatering or the additional exposure of additional water surface shall <br />occur until after required approvals are obtained. Scrapers, dozers, backhoes, and similar equipment <br />will be utilized for mining of dewatered areas and other areas above the water level. Mining will also <br />include the below elements, not necessarily in the order listed, with some of these activities will occur <br />concurrently: <br />Repair existing fencing and new fencing installation. Any new fencing will be accordance <br />with Adams County regulations, and where applicable permits for fencing shall be obtained. <br />2. Prior to earthmoving activities eradication of all noxious plants, and continue to follow the <br />'`Noxious Weed Control Plan" in the original permit and copied as page 8 in this exhibit. <br />3. Installation of a conveyor and wash pipe crossings of the Fulton Ditch for conveyance of <br />excavated material and pipe to bring fresh water to and silt wash from the existing Plant Site. <br />These two crossing points are already disturbed with existing piping and private drives across <br />the Ditch, that the Ditch company utilizes. No new disturbance will be caused by use of these <br />two crossing points, and these two crossing points will remain after mining is completed, <br />therefore these two crossing areas are not and need not be included in the permit area. <br />2 <br />